JMS MARINE SQUARE SECTOR 102 GURGAON

JMS MARINE SQUARE

JMS Marine Square is a structure of elegance with the finest flooring and flamboyant interiors housing a large number of retail outlets that have appealing storefronts for the overlooking pedestrians.These retail stores range from 200 sq.ft. to 5000 sq.ft. Greatly designed common spaces and the starkly evident façade is a state of artwork with a surprisingly low-maintenance requisition.The beautifully designed fine-dining restaurants serve as a great place for family dinners and corporate meetings.

ABOUT JMS BUILDTECH

Established in the year 2013, JMS Buildtech Pvt. Ltd a full spectrum real estate company is NCR’s most heralded debutant in realty space with a net worth of Rs 900 Crores. Extensive licensed land bank of around 80 acres in Sectors 92, 93, 95 A and 95 allows us to plan much better and also to be shielded from an escalation in real estate prices. The company holds a debt free status reflecting their liquidity and transparency in terms of funding capability to sustain its projects in the realm of high interest regime.

12% Assured Return with Bank Guarantee

Assured Rental till offer of possession

Assured Rental till offer of possession. Double Advantage of your Investment growing of the same time and getting returns from the day one.

JMS Marine Square Given Bank Guarantee

Assured Gift on Each Booking

FESTIVE CARNIVAL: 1st jan - 28th feb all the booking will be rewarded with royal enfield/maruti suzuki celerio or smartphone, smart tv up to Rs.30,000

Rental assurance

Post Possession Lease Guarantee.

Maximum benefits by availing a secured rental for 7 years from day 1.

Amenities

  • LGF - Retail min area 120 sq.ft
  • GF - Retail min area 200 sq.ft 20 feet height
  • FF - Retail min area 220 sq.ft 15 feet height
  • SF - Retail min area 130 sq.ft & Food Court min area 450 sq.ft
  • TF - Multiplex 5 Screen
  • Bang on 75 meter wide road with dedicated segment of retail spread across Ground, First and second with food court & screen multiplex on third fourth level.
  • Low Maintenance Module, Double Height Retail Shop on GF.
  • Street level entrance overlooking pedestrian walkway for every retail outlet.
  • Maximum units open towards central atriums & external soft space with water fountains.
  • Comfort and convenience of escalators and high speed elevators.
  • Multi-cuisine restaurants, food court, outdoor café, and hygienic street food zone
  • Premium density- Surrounded by 2 major townships BPTP Amstoria & Uppals 99, 20000 High End Apartments to be possessed soon.
  • One of the best located projects & Just 15 minutes drive from IGI Airport & Dwarka
  • Located near to diplomatic area & Metro station of Dwarka
  • Easy accessibility to all major business & Retail destinations.
  • High Catchment area of residential projects.
  • 24*7 Securities with CCTV Surveillance.
  • 200 – 2000 sq. ft Shop size.
  • Assured Rental till offer of Possession

LOCATION MAP

  • Strategically located just off Dwarka Expressway.
  • In close proximity to the proposed metro corridor.
  • In close proximity of proposed Golf Course by DDA in Delhi
  • Approximately 15 minutes from the airport & proposed diplomatic Enclave.
  • Approx 10 mins drive to proposed AIIMS
  • DPS Schools operational in close proximity
  • Double height retail shop on ground floor

GALLERY

DROP AN ENQUIRY

Agent RERA No: 385 of 2017

Project RERA No - 22 of 2018